性欧美videos高清精品丨久久人妻精品国产一区二区丨久久九九看黄一片丨狠狠干免费视频丨午夜片无码区私人影院丨引诱漂亮新婚少妇丨久久精品国产一区二区三区肥胖丨国产桃色视频丨欧美日韩免费在线观看丨日本va欧美va精品发布丨亚洲欧美另类激情综合区蜜芽丨日韩欧美激情丨精品一区二区三区国产在线观看丨www视频在线丨欧美精品一二三四区丨精品精品国产高清a毛片牛牛丨日本少妇做爰全过程毛片丨7777日本精品一区二区三区丨毛片av中文字幕一区二区丨日韩黄色短片丨欧美v国产v亚洲v日韩九九丨丝袜美腿丝袜亚洲综合丨婷婷综合少妇啪啪喷水动态小说丨精品视频免费在线观看丨爱爱中文字幕

您好!歡迎訪問(wèn)濟(jì)南防水工程公司網(wǎng)站!
專注濟(jì)南防水工程,防水材料,防滲工程貼心的服務(wù),合理的收費(fèi),熱誠(chéng)期待您的來(lái)電!
全國(guó)咨詢熱線:152-5313-4653
聯(lián)系我們

【 微信掃碼咨詢 】

152-5313-4653

濟(jì)南專業(yè)防水公司講解屋面防水施工條件

作者:admin 瀏覽量:535次 來(lái)源:本站 時(shí)間:2022-12-28 15:23:06

信息摘要:

出色底層表面的尖銳硬物、砂漿疙瘩等根除,不能根除時(shí)應(yīng)選用水泥砂漿抹面掩蓋處置,抹面圓弧半徑應(yīng)大于300mm。

出色底層表面的尖銳硬物、砂漿疙瘩等根除,不能根除時(shí)應(yīng)選用水泥砂漿抹面掩蓋處置,抹面圓弧半徑應(yīng)大于300mm。并將塵土雜物根除潔凈,陰陽(yáng)角、管根部等處更應(yīng)仔細(xì)收拾,若有不一樣污漬、鐵銹等,應(yīng)以砂紙、鋼絲刷、溶劑等根除潔凈。
Well bottom sharp hard object, the surface mortar bumps cannot eradicate eradication, should be used with cement mortar to cover treatment, surface radius should be greater than 300mm. And the dust impurity eradicate clean, yin yang angle, pipe root should be more carefully pick up, if not the same stains, rust etc., should be based on the sand, steel wire brush, the eradication of clean solvent.
平立面交接處的陰陽(yáng)角均應(yīng)做成均勻一起、平整光滑的圓角,陰角圓弧半徑不小于50mm,陽(yáng)角圓弧半徑不小于20mm;防水材料及系統(tǒng)配件需保存在通風(fēng)、單調(diào)的當(dāng)?shù)兀⑦h(yuǎn)離火源,應(yīng)避免日曬、雨淋。
Facade junction of the yin yang angle should be made uniform with smooth, rounded, corner radius of not less than 50mm, corner radius of not less than 20mm; waterproof materials and accessories must be maintained at the local ventilation, monotonous, and away from the fire source, should avoid the sun, rain.
底層表面應(yīng)平整光滑、均勻一起,其平整度用2m直尺檢查,最大空位不大于5㎜,且每米不多于1處;底層需要無(wú)明水即可施工卷材,需熱熔粘貼施工的底層表面應(yīng)盡可以單調(diào),含水率宜小于9%。測(cè)定方法是:將1㎡的卷材掩蓋在底層表面上,靜置2~3h,若掩蓋的底層表面無(wú)水印,且緊貼底層一側(cè)的卷材亦無(wú)凝結(jié)水痕,即為符合粘貼施工需要。
The bottom surface should be smooth, uniform, the flatness of 2m ruler examination, the maximum space is not greater than 5 mm per meter, and no more than 1; the bottom need no Mingshui to construction material, the bottom surface needs to be hot melt paste construction should as far as possible the monotone, moisture content should be less than 9%. Determination of the method is: will roll 1 ㎡ cover on the bottom surface, standing for 2 ~ 3H, if the underlying surface cover no watermark, coil and close to the bottom side of the no condensed water mark, is consistent with sticking construction need.

濟(jì)南專業(yè)防水http://www.zh-echi.com.cn/